Cotality have provided the following templates and documents, designed to assist you when navigating the PAS 2030/35:2023 process and standards, whilst using the PAS Hub software. We recommend that you utilise these to save time and facilitate a smooth journey.
PAS Hub document requirements
This spreadsheet will help to ensure that you have the correct documents and evidence categories to enable a successful and compliant lodgement with TrustMark.
Download
PAS 2035:2023 Design Guidance
TrustMark have published the Design Guidance document for PAS 2035:2023 which gives a lot of good advice for Retrofit Designers as well as the qualifications they will require.
Download
Retrofit design template
Template to provide project overview and details of installation standards.
Download
PAS2030 Annex B pre-installation building inspection
The following templates can be used by installers and coordinators to ensure their Pre-Installation Building Inspections are compliant with Annex B of PAS 2030.
UFI
Ventilation provision checklist
The retrofit design requires that the Ventilation Checklist from Building Regs is completed. You can download the checklist here so the Retrofit Designer can complete it and upload to PAS hub.
Air Tightness strategy
The retrofit design requires an Air Tightness strategy is completed, we have included a template that you can download here.
Overheating assessment
PAS 2035:2023 requires each property to be assessed for overheating when installing insulation measures. You can download the below statement to include within the retrofit design.
Download
Heritage impact assessment
Where the retrofit assessor or retrofit coordinator has identified a heritage significance with the building or area a Heritage Impact Assessment will need be included within the retrofit design documents. You can download an example template here.
Download
Retrofit coordinator site visit templates
We have created these templates to be used for the Retrofit Coordinator site visit which detail the data that will be required to be completed as well as a list of photos to be taken.
Trustmark site visit requirements
Below is the link to the Trustmark document that informs Installers and Retrofit Coordinators around the requirements of site visits within PAS 2035:2023.
Retrofit Coordinator Update Site Visit Requirements
Site visit conflict of interest statements
As a Retrofit Coordinator you will need to inform the customer who will be collecting evidence for projects where a site visit isn't required and also if another qualified person is carrying out the site visit, other than yourself. You can download examples of Conflict of Interest statements below.
Conflict of Interest Statements for Site Visits PAS2035:2023
Coordinator Question Time
Watch the latest monthly Coordinator Question Time (1 hour session) recording. Click here
PAS Hub Clinic
Watch the latest monthly PAS Hub Clinic (1 hour session) recording. Click here
PAS Hub Functionality Focus webinar
Watch the latest quarterly PAS Hub Functionality Focus recording. Click here
PAS Assessment process updates (18 March 2025)
Showing the manual lodgement of PAS 2019 Assessments for SHDF 2.1, 2.2 and HUG2
How to change PAS :2019 assessments for use within PAS :2023 Projects (where the inspection date is before March 30th 2025)